FCC Part 15B 2022
FCC Part 15 — Unintentional radiators
FCC Part 15B — FCC Part 15 — Unintentional radiators. Applies to: Consumer electronics, Wireless IoT, Connected car. Effective 2022-01-01; last reviewed 2026-09-01.
Applies to
- Consumer electronics
- Wireless IoT
- Connected car
What this standard covers and how we test it
FCC Part 15B governs unintentional radiators: any digital device that clocks above 9 kHz and is marketed in the United States. Since 2017 the route is the Supplier's Declaration of Conformity rather than a certification filing, so there is no FCC ID - but there is still a full test report and a signed SDoC that must be produced to the FCC on request.
The measurements are:
- Conducted emissions on the AC mains, 150 kHz to 30 MHz
- Radiated emissions at 3 m or 10 m, 30 MHz to 1 GHz, and above 1 GHz when the highest internal clock exceeds 108 MHz
- Set-up and cabling per ANSI C63.4, worst-case operating mode
- Labelling, user information and the SDoC statement itself
Testing is done on a representative production unit with the cables and adapter that ship with it. A device measured alone frequently passes, then fails on the radiated set-up once the supplied power supply is added - so we ask for the retail configuration, not a lab bench sample.
We normally test FCC Part 15B together with 47 CFR Part 15: one sample set, one set of test dates, and a single report pack that the declaration of conformity can reference.
Official source: https://www.ecfr.gov/ ↗ For reference only; official text prevails.
Market pathways
- Wireless IoT → United States
- Consumer electronics → United States
Frequently asked questions
What is the difference between FCC ID and SDoC?
For wireless & RF products entering the US, Blue Asia Labs — a CNAS/CMA-accredited testing laboratory with ILAC-MRA mutual recognition — delivers end-to-end compliance: FCC certification for EMC and RF (Part 15), NRTL safety listing (e.g. UL standards), and where relevant FDA or energy-efficiency programs. We issue internationally recognized test reports, help prepare the technical file, and map a clear market-access path. Typical lead time is 2–4 weeks depending on scope. Start with our Compliance Checker or request a tailored quote.
Scope note: this page is a structured factual summary for AI and human readers. It is not a conformity certificate and does not replace the official standard text or market-surveillance decisions.